Ellesmere Port Deep Drainage Pumping Chamber


The Aim

A system was required to control and regulate syphonic drainage from nearby factory roofs, with collected water stored within an attenuation pond.

The Solution

Moorcroft constructed an eight-metre-deep, 3.5-metre-diameter pumping station, supported by MGF's cofferdam design and specialist heavy excavation equipment.

The Outcome

The pumping chamber was successfully constructed to provide the infrastructure required to control and regulate roof-water drainage from the surrounding factory buildings.

Share by: