High-Tolerance Warehouse Slab Preparation
The Aim
The warehouse development required careful preparation for a high-tolerance concrete floor slab, with individual bays accurately set up ahead of the concrete pour.
The Solution
Moorcroft prepared the warehouse slab area and established the bays ready for concrete placement, working to the tolerances required for the finished floor.
The Outcome
The prepared area was left ready for the concrete pour, providing the required groundwork for construction of the high-tolerance warehouse slab.



